From one requirement to an operating yard
01
Entitled for outdoor use
Zoning and approvals in place - the hardest part of IOS, handled before you sign.
02
Heavy-duty surfacing
Stabilized or paved yards engineered for loaded trailers, containers and equipment.
03
Secure perimeter
Fencing, controlled gates, lighting and camera coverage so your assets are protected around the clock.
04
Circulation that works
Layouts planned around turning radii, stall dimensions and in-and-out flow.
D4 outdoor storage sites
Address
I-287 Corridor · Coming Soon
I-287 Corridor · Coming Soon
I-287 Corridor · Coming Soon
Coming Soon · NJ
Route 202 Soon · NJ
Usable Acre(s)
±3.0 Usable Acres
±2.0 Usable Acres
±1.0 Usable Acre
±2.0 Usable Acres
±4.30 Usable Acres
Building Size
±16,400 SF
±7,000 SF
±5,250 SF
±10,000 SF
±7,500 SF
Drive Ins
12
8
4
8
6
Clear
40'
40'
40'
40'
32'
Est. Delivery
Q4 2028
Q4 2028
Q4 2028
Q4 2028
Q2 2029